How to Get Buy-in and Overcome Technical Challenges for a Chiller Electrification Project
Sponsored by EN-POWER GROUP
Learn how a luxury multifamily building overcame multiple challenges to electrify its central cooling plant. The 35-story, 560,000 sqft property located on Central Park South worked with EN‑POWER GROUP to upgrade its outdated single-stage steam absorption chiller. Our engineers faced a tight construction schedule, a heavily foot-trafficked location, and limited electrical infrastructure but successfully replaced the chiller on time with a far more efficient electric modular chiller plant, all while avoiding expensive rigging and re-wiring of the facility.